Hedge care for the village and the villages around it. 5% off for pensioners07763 100 477 · hello@staplehedges.co.uk
Staple Hedges & Tree ServicesStaple · Shatterling · Ash

← All guides · Rules & paperwork · November 2026

The Management of Hedgerows (England) Regulations 2024: from unaware to compliant in four stages

A set of regulations that replaced cross-compliance came into force on 23 May 2024, and they caught a fair few farmers and contractors off guard. Here is what a farmland boundary hedge in east Kent looks like when those regulations apply but nobody has actually checked, what a straightforward compliant annual programme looks like, and the four stages between: working out whether your hedges are covered, understanding the cutting window, respecting the buffer strip, and keeping a record that holds up.

Before

A field boundary hedge around Staple or Shatterling before anyone has looked at the 2024 Regulations: the contractor turns up in September, cuts the hedges as close as the flail will go on both sides, and drives on to the next job. No record kept, no buffer strip observed, no check on whether the hedge was covered. This was common practice under cross-compliance, and cross-compliance ended on 31 December 2023. What replaced it, the Management of Hedgerows (England) Regulations 2024, is a standalone statutory instrument, not a condition of subsidy payments. It applies whether or not the land is in a scheme, and enforcement sits with the Rural Payments Agency.

After

The same farmland boundary, same contractor, autumn cut. The difference is a few questions answered before the job starts: the hedge is confirmed as 20 metres or more on agricultural land, the cut is booked for September rather than August without an exemption notification, the flail tracks stop 2 metres out from the hedge centre on each side, and there is a brief note in the farm diary. That is the full picture of compliance. It does not add significant cost or time to the job, but it does change what you need to know before you lift the machine.

What happens in between

Four stages take you from the unexamined routine to the compliant one. None is complicated, but each has a specific thing to establish before you move on.

Stage 1: scope check (is this hedge covered?)

The Regulations apply to a hedgerow on agricultural land in England where the hedgerow is 20 metres or longer. That covers the great majority of field boundary hedges in the farmland around Staple, Shatterling, Ash and Woodnesborough, where most runs are significantly longer than 20 metres and the land is clearly agricultural. What falls outside the scope: hedgerows under 5 years old, field parcels under 2 hectares, and domestic garden hedges. If the hedge is on a paddock or an orchard in a residential curtilage, the domestic-garden exclusion may apply, but on a working arable or mixed farm in east Kent the default assumption is that it is covered.

Removal of hedgerows still falls under the separate Hedgerow Regulations 1997, which require prior notice to the local planning authority before any removal of a qualifying hedgerow. The 2024 Regulations govern management, not removal: they tell you when and how to cut, and how wide a strip to leave at the base. They say nothing about removal, which remains a different process entirely.

Stage 2: the cutting window

The Regulations prohibit cutting, flailing or trimming a covered hedgerow between 1 March and 31 August. The window for routine cutting is therefore 1 September to 28 (or 29) February. For east Kent farmland hedges this aligns naturally with the growing season and with the Wildlife and Countryside Act 1981 nesting caution: the September-to-February window avoids both the main growing flush and the main nesting period.

There is one specific August exemption. A farmer may cut a covered hedge in August to allow sowing of oilseed rape or temporary grassland, but only where the land is immediately adjacent to the hedge and the sowing is genuinely imminent. This exemption requires advance notification to the Rural Payments Agency before the cut happens. It is not a blanket August exception: it is a narrow one tied to a specific agronomic operation on the adjacent land, and failing to notify the RPA in advance means the cut is not exempt.

How the nesting season and the 2024 Regulations overlap

The 2024 Regulations' cutting ban (1 March to 31 August) and the Wildlife and Countryside Act 1981's nesting-season caution cover similar ground but are legally distinct. The Regulations give a fixed statutory window; the WCA 1981 operates on the actual state of the hedge and the presence of active nests. A hedge cut on 2 September complies with both instruments, but the WCA 1981 still requires a walk before cutting to check for late second-brood nesters. Neither rule displaces the other. See the separate guide on nesting-season timing for the full detail on the WCA walk.

Stage 3: the buffer strip

The Regulations require that no cultivation, application of fertiliser, or application of pesticide takes place within 2 metres of the centre of a covered hedgerow. The measurement is from the centre of the hedge, not from the outer edge of the canopy. For a typical mixed native hedge on an east Kent field boundary, the centre is roughly the line of the main stems, and 2 metres out from that in each direction keeps the cultivations and chemical inputs clear of the root zone and base vegetation.

In practice this means adjusting tramlines or headland passes that have historically run close to the base of the hedge, and ensuring that any knapsack or boom sprayer work stops short of the 2-metre line. The strip does not need to be recorded as a separate land parcel, but the farmer needs to be clear about where it falls on each boundary. On a typical arable block in this part of Dover District, most headland passes already leave a margin of some kind: the question is whether the existing margin is wide enough and whether it is genuinely free of chemical applications.

Stage 4: building a compliant programme

Compliance does not require a detailed hedgerow management plan, but it does require that the actual operations on covered hedges are carried out within the rules. A simple note in a farm diary or a job sheet for each cut, recording the date, the hedge identity or field number, and the method, is enough to demonstrate compliance if the RPA follows up. The RPA's approach to enforcement is described as advice-led, with farm visits and guidance before formal action, but the statutory basis is not advisory: a breach is a breach of a statutory instrument, and the advice-led approach describes how enforcement is applied, not whether the obligation exists.

For a farm in the Staple and Shatterling area with a typical number of field boundary hedges, setting up a compliant programme is a morning's work: list the covered hedges, confirm each one is 20 metres or more, note the adjacent land use where it matters for the August exemption question, and brief the contractor before the first autumn cut. After that it is a matter of booking the cut in September rather than August and stopping the machinery 2 metres clear of the centre line. A single A4 record sheet per field block, updated each time the hedges are cut, keeps the evidence in order if it is ever needed.

Not sure whether your hedges are covered?

Call 07763 100 477 or send a postcode to hello@staplehedges.co.uk. I can confirm on site whether a given hedge falls under the 2024 Regulations and quote for a compliant autumn cut.

Sources: Management of Hedgerows (England) Regulations 2024, SI 2024/503 (legislation.gov.uk); DEFRA Farming blog, "New hedgerow protection measures" (defrafarming.blog.gov.uk, May 2024); gov.uk statutory guidance on the Regulations; reference video: "Management of Hedgerows Regulations (2024)", Rural Payments Agency (YouTube, youtube.com/watch?v=rRofcKyZgEg).